Friday, 17 July 2015
Refurbishment project in Bermondsey, SE1
We were recently called in to help complete a refurbishment project in Bermondsey, SE1 which involved us acting in the role of advisor to the main contractor as they worked towards resurfacing the flat roof at the top of the school for the pupils to use as a play / outdoor classroom. The main contractor was Kier Services – Facilities Management and the sub-contractor, who called Wallbarn in for advice, was PM Associates. Working To a Tight Schedule The time schedule for the project was extremely tight with the roof needing to be re-waterproofed and covered with the hard landscaping in the one-week window of the half-term break. The roof deck was built to a fall to allow adequate drainage off the surface, the overall fall across the 10 metre length was approx. 100mm. Access to the roof area was very restricted. Working with no crane resulted in all of the products having to be handballed up five flights of a very tight, Victorian staircase. Handballing 3 metre lengths of timber dec
http://www.wallbarn.com/refurbishment-project-in-bermondsey-se1/
No comments:
Post a Comment