Friday, 7 November 2014

Case Study, Timber Decking Using TD Supports, London


This project was a refurbishment of an existing building, where the waterproofing membrane had been completely replaced. There was a large roof deck built to a fall and several small terrace areas.
http://www.wallbarn.com/projects-case-studies/case-study-timber-decking-using-td-supports-london/

No comments:

Post a Comment